|
Our streamlined installation schedule used in conjunction with the most updated meters
and equipment, including SensArray RTD temperature wafers,
Our typical install durations are as follows:
Single Block ACT8/12 systems
|
|
Double Block ACT8/12 systems
|
|
|
|
|
|
|
|
Our install coverage includes everthing from tool move-in
and fine leveling to process setup and coating wafers. Please click on the following link to view a detailed list of
our services performed with every install: INSTALLATION OUTLINE
We will gladly submit to you a detailed installation schedule
and timeline upon request.
|