Our decommission procedure includes the following:
- The removal of all chemical (resist, solvent, developer, HMDS, etc)
- A comprehensive solvent, IPA, or DIW flush through all buffer tanks, degas modules, dispense lines (from
source to nozzle), pumps, drain & vent lines
- An N2 purge of all chemical systems for a duration of at least eight hours
- The securing of all support equipment including temperature controlled water and T/H units
- The securing of all robotics, arms, and process modules
- The securing of all panels, doors, and drawers
- The securing of all electrical cabling and tubing
- The deletion of all proprietary information from hard drives
- The removal of all accessories
- A detailed inventory of the system
Upon your request, we will gladly submit to you our decommission procedure for your review.
|